What’s Wrong with the FEMA Trailers?
The floors are assembled first. The roof, typically constructed in another part of the factory, is set on top of the walls. Once the house structure is in place, the plumbing, electrical wiring and...
November 9, 2023
The floors are assembled first. The roof, typically constructed in another part of the factory, is set on top of the walls. Once the house structure is in place, the plumbing, electrical wiring and...